(+34) 924 550 553
oficina@bodegaszoido.com
Pol. Industrial Los Caños, 240. 06300 Zafra (BA)

Parametric Design

Clients

Gateway Casinos

Region

Vancouver, BC

City

New York

Budget

$74 Million

Year Completed

2023

Size

160,000 sq. ft.

Sector

Buildings

Sub-Sector

Culture & Recreation

About Project

Cascades Casino Delta is a mid-size gaming and entertainment facility located on a 400,000 sq. ft. site near the south end of the George Massey Tunnel. The vision for this casino was a full-service entertainment destination with a casual ambiance and the scale and amenities associated with a big-city entertainment facility, including exceptional customer service and attention to detail.

The project involved a total floor area of 161,000 sq. ft., which includes a 42,227 sq. ft. casino floor and 124 guest rooms within an attached five-storey hotel building (built by another developer). Guests can enjoy over 500 slot machines and gaming tables. The casino also features dining options such as MATCH Eatery & Public House, Summit Bar, and The Buffet.

Our Client’s Challenge

Developing and maintaining transformation programs in finance, logistics/supply chains, information technology, training and procurement to help foster cost effectiveness and efficiency without the loss of Defense capability. Taking advantage of opportunities to help reduce costs while maintaining operational capability through partnerships.

Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Fusce elementum, eros et scelerisque hendrerit, nisi augue placerat
Integer eget viverra ex. Praesent eu luctus ex.
Nunc consectetur maximus molestie. Duis nec elementum erat.

Our Approach And Solution

The expansion includes eight additional wide-body gates, four jet bridge gates and four remote stand operation bus gates to increase capacity in the international terminal. The new restaurants and bars, retail areas, digital art and pet relief area improve the passenger experience. An iconic showpiece within the expansion is an island forest, complete with three live hemlock trees and contained within an open-air glass atrium.

What Customers Say?

“ To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including. ”

Mr. R. Ramaanujam
Director Operations and Sustainability